rss icon Subscribe
desktop mobile

Goliat Oilfield Shut for Maintenance

(Photo: Eni)

Oil production at Eni's Arctic Goliat field off the coast of Norway was shut on Monday for planned maintenance, a company spokeswoman told Reuters.

The outage is expected to last for about 10 days, she added.

Goliat, the world's northernmost producing oilfield, has a capacity of close to 100,000 barrels of crude per day.


(Reporting by Terje Solsvik, editing by Camilla Knudsen)

Sep 18, 2018

 

Arctic Operations

Novatek, Rosatom Plan LNG-Powered Icebreaker Fleet

Image: Novatek

Russia’s natural gas producer and the operator of the giant Yamal LNG export project Novatek

Icebreaking LNG Carrier Named Vladimir Vize

Vladimir Vize naming ceremony. Photo: Mitsui O.S.K. Lines, Ltd.

Mitsui O.S.K. Lines (MOL) announced that a naming ceremony for a new icebreaking liquefied natural

Rosneft Orders Two Oil Tankers from Zvezda Shipyard

A previously delivered vessel of the same class of Green Funnel tankers (Courtesy SCF Group)

Russian oil company Rosneft announced it has ordered two Aframax crude oil tankers to be built at

Offshore

INSIGHTS: John Rynd / President , CEO and Director, Tidewater Inc.

John Rynd / President , CEO and Director, Tidewater Inc.

Mr. John Rynd graduated from Texas A&M University with a Bachelor of Arts degree in Economics.

Answering the Call for Environmental Answers

The RDC project team poses on USCGC Hollyhock after completion of the offshore mitigation system prototype test.  From left to right, LT Charles Clark, Alexander Balsley, and Coast Guard Academy Cadet 2/c Valerie Hines.)

The Coast Guard has developed two separate mitigation system prototypes specifically designed for

Hydra Preparing for Offshore Upturn

The SAT-14 diving system (Photo: Hydra)

Offshore and subsea construction company Hydra said it has entered into the saturation diving

Maritime Apps