rss icon Subscribe
desktop mobile

Metal Shark Introduces New Line of Passenger Vessels

Metal Shark's new “Endurance PV-X” passenger vessel lineup

Posted by Joseph Keefe

At the same time, Metal Shark also announces reduced lead times for newbuild vessels.

Louisiana-based shipbuilder Metal Shark has partnered with design firm Incat Crowther to develop an entirely new line of passenger vessels.

At last week's Passenger Vessel Association (PVA) Maritrends Conference in Savannah, Georgia, Metal Shark introduced its new "Endurance PV-X" passenger vessel lineup, with 26-meter (150-passenger) and 32-meter (350-passenger) models now available and additional offerings to follow.

The welded-aluminum, high-speed, low-wake, catamaran Endurance PV-X models are touted by Metal Shark as "next-generation passenger vessels" and feature thoroughly proven Incat Crowther hull designs well-regarded among passenger vessel operators for their efficiency and performance. The new models have been optimized for comfort, safety, and operational efficiency, offering a range of configurations and optional features designed to suit individual operator requirements.

The Endurance PV-X vessels stand out with chiseled, modern lines derived from Metal Shark's latest military patrol boat designs. Large windows create a sense of openness while enhancing the view from within. Comfortable seating arrangements, wide aisles, and roomy head compartments combine to enhance the overall passenger experience. Amenities such as LED infotainment screens, charging stations for electronic devices, onboard wifi, and bicycle racks are all available. Metal Shark's signature pillarless glass pilothouse offers best-in-class visibility from the elevated helm station.

Initially shown in a conventional forward-facing passenger ferry layout, alternate arrangements have been designed for whale watch or dinner boat operators, with convertible seating available in select arrangements for maximum versatility.

In addition to a design that enhances comfort, efficiency, performance, and safety, one of the Endurance PV-X's most important benefits to customers is availability.

Metal Shark showcased its ability to quickly and efficiently produce passenger vessels in 2017, delivering a total of eight 150-passenger vessels on or ahead of schedule. The new Endurance PV-X models are intended to allow the company to deliver passenger vessels even faster than before.

"The development of the Endurance PV-X line is the latest step in our ongoing quest to support clients with high-quality vessels delivered in the shortest timeframe possible," explained Metal Shark's CEO Chris Allard. "We offer a smart alternative for operators who do not want to wait for two years or more for a new passenger vessel. With these standardized production-ready platforms, combined with our proven serialized production methodologies, we can deliver the 150-pax vessel in eight months and the 350-pax vessel in ten months from contract signing."

Metal Shark is currently slated to deliver nine passenger vessels this year, with numerous 150 and 350-passenger vessels currently under construction at its Franklin Louisiana shipyard for markets including New York, Washington DC, and New Orleans. However, company executives stress that production slot availability is not a problem.

"Thanks to the large number of contracts we've announced over the past year, a few clients have gotten the mistaken impression that we're too busy to take on additional work," said Metal Shark's Vice President of Commercial Sales, Carl Wegener. "We're definitely busy at both of our facilities but thanks to efficient engineering and production management our operations are optimized for volume. We don't need to ramp up to take on additional projects; we just keep feeding the machine."

Feb 9, 2018

 

Contracts

MOL Snaps Up Adriatic Gas via Croatian Unit

Image: ENI

MOL Group’s Croatian INA agreed to buy Eni Croatia BV, a wholly-owned member of Eni Group

GasLog Partners Signs New Charter Agreement with Cheniere Energy

Photo: GasLog Partners

GasLog Partners announced that it has entered into a new multi-year time charter for the GasLog

GTT Bags Contract for LNG Carrier Tank Design

French engineering from GTT said it has received an order from South Korean shipyard Hyundai Heavy Industries to design the tanks of a new 174,000 cbm liquefied natural gas (LNG)

Ferries

Divers, Underwater Drone Searching for 192 Missing in Ferry Disaster

(Photo: National Search and Rescue Agency Republic of Indonesia)

Divers and an underwater drone on Wednesday joined a fleet of rescue vessels in Indonesia's search

ABB Power and Automation for New Indian Ferries

Rendering of the new 1,200-passenger ferry to be built at Cochin Shipyard in India (Image: ABB)

ABB said it has signed a contract with India’s largest shipbuilding and maintenance facility

Rescuers Hunting for Ferry Disaster Victims in Indonesia

The search for victims of a ferry that sank in the lake of an ancient supervolcano crater in Indonesia will resume on Wednesday with divers and an underwater drone to scour the

Maritime Apps